Geotechnical tools.
One workspace.

Manage projects, analyze field and lab data, and create reports. All in one connected suite.

Free during early access. Web-based, nothing to install.

The Atlaned workspace: project dashboard with recent projects, quick actions for new boreholes and analyses, and the module sidebar.

The workflow

Geotechnical work is fragmented. Atlaned connects it in one workflow.

The suite

Four tools. One project record.

  1. 01

    Set up the project

    Create a project and invite your team.

  2. 02

    Add your data

    Enter or import boreholes and lab results.

  3. 03

    Run the analysis

    Use Field, Section, Slide, or Quake on the same data.

  4. 04

    Report and export

    Fill your report templates and export.

Turn SPT and CPT records into soil profiles and parameters.

Run SPT and CPT analysis against the boreholes in your project. Field classifies soil behaviour, applies the corrections and correlations you choose, and checks liquefaction triggering layer by layer.

Explore Field
  • Robertson soil behaviour type charts (1990, 2010, 2016)
  • SPT corrections and correlations, including Peck, Skempton, and Liao & Whitman
  • Liquefaction triggering: Boulanger & Idriss (2014), Robertson (2010), NCEER (1998)
  • Save calculation branches and recalculate with new inputs

Built for every role

One platform. Four ways your team uses it.

See the suite →
Consultant

From test data to soil parameters. No spreadsheets in between.

Run SPT and CPT analysis on the borehole record, compare correlations, and keep every calculation with the project.

qc · 0–18 m Computing
Field crew

Enter borehole data once.

Record layers, samples, and field tests against the borehole, or import existing logs. The office works from the same record.

0.0 – 1.2 m

Silty sand

N = 8

1.2 – 3.4 m

Clayey sand

N = 22

3.4 – 6.0 m

Lean clay

N = 4

Project lead

Plan with the ground you already know.

See every existing and planned borehole on the project map before the rig arrives.

Harbor Extension 84%
M40 Junction 17 42%
Vlaardingen Quay 96%
Reviewer

Review with the history behind every result.

Calculation branches and the project activity log show what changed, when, and who changed it.

Activity · CPT-07 v3 → v4
EM Robertson 2010 applied 14:02
JD Water table changed to 2.4 m 14:08
EM Recalculated as new branch 14:11

See Atlaned on your own data. Join the early-access waitlist, or book a demo and we'll walk through your workflow.